Coordination of Flood Post Needs to Be Intensified
access_time January 25 2016 04:31 PM remove_red_eye 1771
Reported by Rudi Hermawan | Translated by Nugroho Adibrata
Reported by Rudi Hermawan | Translated by Nugroho Adibrata
already high. Coordination between headman and regional working unit (UKPD) must be intensified, particularly in the preparation of flood post.
The intensity rain in the capital is currentlyI hope coordination with flood post in each region could re-intensified
"I hope coordination with flood post in each region could re-intensified," expressed Assistant of Central Jakarta Government, Budiroso, Monday (1/25).
He also reminded flood and fallen tree problem is natural thing, thus there must be anticipation.
Flood Post Prepared in Warakas Urban Village"We must be responsive quickly and do coordination well," he finished.